Building a 5 Marla double-storey house in Pakistan is a major milestone for many families, especially because it offers a practical balance between affordability and modern living space. On average, the total construction cost is estimated at around PKR 55 lakh, depending on material quality, location, design, and labour rates.
With rising inflation and increasing construction material prices, especially cement, sand, and steel, the overall cost of housing construction continues to fluctuate. This makes proper budgeting essential before starting any project.
Key Factors Affecting Construction Cost
The total cost of building a 5 Marla house depends on several important factors:
- Quality of construction material used
- Location of the plot (urban vs suburban areas)
- Labour charges and contractor rates
- Architectural design and structure complexity
- Market prices of cement, steel, and sand
Among all these, the grey structure cost forms the largest portion of the total budget.

Grey Structure Cost Breakdown (5 Marla House)
The grey structure includes the core structure of the house such as foundation, walls, roof, plumbing lines, and electrical piping.
Detailed Cost Breakdown
| Category | Estimated Cost (PKR) |
| Labour Cost (foundation, structure, plumbing, electrical) | 974,000 |
| Bricks (approx. 56,000 units) | 784,000 |
| Sand (Ravi & Chenab mix) | 251,075 |
| Crush / Bajri (1,721 cu. ft.) | 251,266 |
| Cement (approx. 605 bags) | 738,100 |
| Rebar / Steel (3 tonnes) | 780,000 |
| Kassu (filling material) | 85,008 |
| Plumbing Work | 674,000 |
| Electrical Wiring | 148,000 |
| Termite Proofing | 8,500 |
| Waterproofing | 16,444 |
| Roof Insulation | 36,354 |
Total Estimated Grey Structure Cost
💰 Approximate Total Cost:
| Category | Total Cost |
| Grey Structure (Overall) | PKR 5,572,000 |
This estimate reflects average market prices and may vary based on location, design choices, and material quality.
Understanding Construction Stages

A 5 Marla house is usually constructed in two main phases:
1. Grey Structure Phase
This includes:
- Foundation work
- Brick masonry
- Cement plaster
- Roofing
- Basic plumbing and wiring
This phase accounts for nearly 60–70% of total cost.
2. Finishing Phase
This includes:
- Tiles and flooring
- Paint and polish
- Kitchen fittings
- Doors and windows
- Electrical fixtures
Why 5 Marla Houses Are So Popular in Pakistan
5 Marla houses remain one of the most preferred housing options due to:
- Affordable construction cost compared to larger plots
- Ideal size for small to medium families
- Easier maintenance
- High resale and rental demand
- Availability in most housing societies
Covered Area of a 5 Marla House

| Description | Area |
| Total Covered Area | ~1,975 sq. ft. |
| First Floor Area | ~910 sq. ft. |
FAQs
How many rooms can be built in a 5 Marla house?
Typically, a 5 Marla house can include 3 to 4 bedrooms, along with living rooms, kitchens, and bathrooms.
How long does construction take?
A standard 5 Marla double-storey house usually takes 4 to 6 months for completion.
How many bricks are required?
Approximately 56,000 bricks are needed for construction, depending on design and structure.
Final Thoughts
Constructing a 5 Marla double-storey house in Pakistan requires careful planning, budgeting, and market awareness. With an estimated cost of around PKR 55 lakh for the grey structure alone, homeowners must consider inflation and material price fluctuations before starting construction.
A well-planned construction strategy not only ensures cost efficiency but also guarantees long-term durability and value for your investment.



